How To Do Commercial Metal Framing

We do a lot of metal stud framing on commercial projects.
How to do commercial metal framing. Make sure you leave it loose until the drywall goes up. Plumbing electrical and other fix-tures and mechanicals within the framing cavities must be flush with or inside the plane of the framing. A steel building from General Steel is a versatile solution for a commercial space.
This way you can place the top and bottom plates against the floor layout to make sure you have accurate cuts every time. The proper way to handle an inside corner when you use metal stud framing is sliding that first sheet into the inside corner and fastening the last stud adjacent to the drywall. Add header measurements door openings and angles to the floor layout.
You do not need an engineer to design a two-story above-grade structure using the prescriptive method but some jurisdictions may require an engineers stamp. Cut each flange of the track on both ends 1 inch 25 cm lengthwise. Fabricate metal headers by cutting the track 2 inches 5 cm longer than the rough opening width.
AISI S230-15 Standard for Cold youre. This is a nice informative article. You have hit the basics well for someone to get started.
That means that through working with our experienced design team you can implement all of the custom components. Fasteners used to assemble the framing must be driven. Metal cross braces between rows.
Metal framing is faster to accomplish. Whereas for residential projects Home Check Plus usually uses wood stud framing. So if youre planning to hire people to do the job their labor cost would be lower as there would be less time needed to accomplish framing with metal.